February

The scaffolding was erected at the beginning of February and the construction of the hotel has slowly started! A fun stage! This month the floor was filled with foam concrete (for insulation) and work was done inside on the pipework and the air conditioning supply and drainage. In mid-February, the installation of the timber frame walls started. At the end of February all timber frame walls were placed.